c071101 Miser Project
Construction Material |
0.0.2 2024-04-02 09:15 -0700 |
- Latest version: The latest status of the Miser Project Site Repaving Project can be found via
<https://orcmid.github.io/miser/construction/2007/11/c071101b.htm>.
The latest Web Component to use as the Included Content Page is at
<https://orcmid.github.io/miser/construction/2007/11/c071101b1.htm>
- This version: 2023-11-04 Preservation Announcement 0.1.0 <https://orcmid.github.io/miser/construction/2007/07/c070701d.htm>. Provides the document engineering and related information for these announcements..
- Announcement Insert: The Web Component for the Included Content Page that is inserted for the need for refactoring/preservation is at
<https://orcmid.github.io/miser/construction/2007/11/c071101d1.htm>- Construction Structure Completion Insert: The Web Component that is inserted when a construction structure node has been refactored/repurposed/preserved is at
<https://orcmid.github.io/miser/construction/2007/11/c071101d2.htm>- Content Preservation Completion Insert: The Web Component that is inserted when a content node or a construction zone are all repaved is at
<https://orcmid.github.io/miser/construction/2007/11/c071101d3.htm>- Initial Preservation Assertion Insert: The Web Component that is inserted when new content nodes and construction zones are created in accordance with the preservation requirements:
<https://orcmid.github.io/miser/construction/2007/11/c071101d4.htm>
|
This insert is used as long as this particular set of activities is underway. It is shown in areas that are subject to these activities and others. When a new set of activities are initiated (along with an update announcement), the new insert will fill in where a preservation insert is still in place.
This Construction Structure was successfully preserved as part of the 2023-11-04 stage of the Site Refactoring/Preservation Project. Check those pages for additional details of the approach to preservation and corrections.This insert is used where the Construction Structure has been preserved, replacing any changes-needed announcement insert there. In some places, such as construction zones, a construction structure completion and a content repaving completion will both be inserted.
The Content Material here was successfully repaved as part of the 2023-11-04 stage of the Site Refactoring/Preservation Project. Check those pages for additional details of the approach to correction and upgrade.This insert is used where the Content Material has been repaired and preserved, replacing the announcement insert there. Note that this is about content, not the underpinning construction structure and other site scaffolding.
When new sections and content is introduced and the material is paved correctly from the beginning, the following insert is appropriate:
The Construction and Content Material here was created in conformance with the 2023-11-04 style and location requirements of the Site Refactoring/Preservation Project. Check that folder for additional details of the approach to correction and upgrade.
The first priority is to have the construction structure of the site be current and properly connected.
This is accomplished by performing a review starting with the "front porch:" the root materials at http://orcmid.github.io/miser/. Work items and their completion will be reported as part of the front-porch Construction Zone.
After the front porch is adjusted, the construction structure of each subfolder is reviewed, extending recursively through all of the construction-structure elements only. Additional items that happen to be noticed will be added to the work items of the applicable construction zone.
The construction structure and the related construction zones can be located by navigating the construction structure provided at the front porch.
When the construction structure is reviewed and adjusted as necessary, a completion message will be inserted to avoid wondering which structures have and have not been reviewed.
The second priority is to have the content be consistent, reachable, and properly linked. Correction of links is crucial because some material is in different (relative) places, whether external or at other transpositions to orcmid.github.io..
These activities will be carried out in parallel, with primary content adjusted as quickly as possible.
In addition to percolation of consistent construction structure throughout the site, there is also attention to these particular problems:
Assuring consistent HTML 4.01 conformance of all pages, with Unicode UTF-8 character sets.
Ensuring that links and the their targets agree in case.
Having all fragment identifiers be NCNames (always starting with alphabetic characters)
You are navigating
construction material of the Miser Project |
created 2023-08-24T17:55Z by orcmid |