c071101 Miser Project
Construction Material |
0.01 2023-11-11 20:16 -0800 |
- Latest version: The latest status of the Miser Project Site Repaving Project can be found via
<https://orcmid.github.io/miser/construction/2007/11/c071101b.htm>.
The latest Web Component to use as the Included Content Page is at
<https://orcmid.github.io/miser/construction/2007/11/c071101b1.htm>
- Next Version: 2023-08-24 Site Preservation Project Announcement <htpps://orcmid.github.io/miser/construction/2007/11/c070707d.htm>
- This version: 2007-11-11 Announcement 0.02 <https://orcmid.github.io/miser/construction/2007/07/c070701c.htm>. Provides the document engineering and related information on the original announcement. THIS MATERIAL IS DEPRECATED.
- Announcement Insert: The Web Component for the Included Content Page that is inserted for this repaving status is at
<https://orcmid.github.io/miser/construction/2007/11/c071101c1.htm>- Construction Structure Completion Insert: The Web Component that is inserted when a construction structure node has been repaved is at
<https://orcmid.github.io/miser/construction/2007/11/c071101c2.htm>- Content Repaving Completion Insert: The Web Component that is inserted when a content node or a construction zone are all repaved is at
<https://orcmid.github.io/miser/construction/2007/11/c071101c3.htm>- Initial Correct Paving Assertion Insert: The Web Component that is inserted when new content nodes and construction zones are created in accordance with the repaving requirements:
<https://orcmid.github.io/miser/construction/2007/11/c071101c4.htm>
|
This insert is used as long as this particular set of activities is underway. It is shown in areas that are subject to these activities and others. When a new set of activities are initiated (along with an update announcement), the new insert will fill in where a repaving insert is still in place.
This Construction Structure was successfully repaved as part of the 2007-11-11 stage of the Site Repaving Project. Check those pages for additional details of the approach to correction and upgrade.This insert is used where the Construction Structure has been repaved, replacing the announcement insert there. In some places, such as construction zones, a construction structure completion and a content repaving completion will both be inserted.
The Content Material here was successfully repaved as part of the 2007-11-11 stage of the Site Repaving Project. Check those pages for additional details of the approach to correction and upgrade.This insert is used where the Content Material has been repaved, replacing the announcement insert there.
When new sections and content is introduced and the material is paved correctly from the beginning, the following insert is appropriate:
The Construction and Content Material here was created in conformance with the style requirements of the Site Repaving Project. Check that folder for additional details of the approach to correction and upgrade.
The first priority is to have the construction structure of the site be current and properly connected.
This is accomplished by performing a review starting with the "front porch:" the root materials at http://miser-theory.info/. Work items and their completion will be reported as part of the front-porch Construction Zone.
After the front porch is adjusted, the construction structure of each subfolder is reviewed, extending recursively through all of the construction-structure elements only. Additional items that happen to be noticed will be added to the work items of the applicable construction zone.
The construction structure and the related construction zones can be located by navigating the construction structure provided at the front porch.
When the construction structure is reviewed and adjusted as necessary, a completion message will be inserted to avoid wondering which structures have and have not been reviewed.
The second priority is to have the content be consistent, reachable, and properly linked.
These activities will be carried out in parallel, with primary content adjusted as quickly as possible.
In addition to percolation of consistent construction structure throughout the site, there is also attention to these particular problems:
Assuring consistent HTML 4.01 conformance of all pages, with Unicode UTF-8 character sets.
Ensuring that links and the their targets agree in case.
Having all fragment identifiers be NCNames (always starting with alphabetic characters)
- Hamilton, Dennis E.
- ODMdev Site Repaving 2007-11-11 Announcement. Miser Project Construction Matierals Note c071101 0.01, October 13, 2013. Available at
<http://miser-theory.info/construction/2007/11/c071101c.htm>.
You are navigating
construction material of the Miser Project |
created 2007-11-11-13:47 -0800 (pst) by
orcmid
|